funnynypd 发表于 2018-1-27 12:41:29

JLC PCB Quality Issue: PCB drilling is missing.

本帖最后由 funnynypd 于 2018-1-27 23:04 编辑

I have placed an order for four different 2-layers PCBs design on https://jlcpcb.com.
I got the DHL parcel today, three of them seems good. One has quality issue:

Order Number: Y2-2204043A

Gerber File preview link:
https://jlcpcb.com/quote/gerberview/743244b8-6694-4294-a224-d471cf7588ff_1_0_1.html
The issue is: All of the through holes are missing.

I think, the PCB skip the drilling process for some reason.






rei1984 发表于 2018-1-27 12:51:56

海外版。不知道有没有投诉渠道

funnynypd 发表于 2018-1-27 12:53:41

本帖最后由 funnynypd 于 2018-1-27 12:56 编辑

I am curious how the drilling process is missed. I believer the drilling process is the first step for all PCB manufacturing.
I am not sure if I am the only one getting the issue. It looks like just affect the PCB with Green Color.
All my other 3 PCB using Black Color (which cost USD$15 more on each design) and they looks ok.

McuPlayer 发表于 2018-1-27 12:55:23

忘记打洞

funnynypd 发表于 2018-1-27 12:57:15

>忘记打洞
Yes, it is.

funnynypd 发表于 2018-1-27 12:58:12

If drilling is missing, can it pass the AOI test?

yuyu87 发表于 2018-1-27 12:58:21

有意思,这也能过QC?

funnynypd 发表于 2018-1-27 13:00:09

>有意思,这也能过QC?
I have the same concern. Maybe because the manufacturing line got too many orders for Green PCB (which is the cheapest, other colors charges USD$15 more) and the AOI and QC process are skipped just like the Drilling process is skipped.

funnynypd 发表于 2018-1-27 13:02:26

On Step 10: "Electric Test",
I am wondering does it actually test the "through-hole" continuity?

LML 发表于 2018-1-27 14:50:35

到jlc官网投诉,马上加急chong

LML 发表于 2018-1-27 14:53:32

上面没打完就发出去了,哎,投诉,确认你的文件没问题,就回加急重做给你的,jlc给我们带来方便,优惠,业务可能如你说,太多,品控跟不上了。哎哎,

wye11083 发表于 2018-1-27 15:28:13

funnynypd 发表于 2018-1-27 13:02
On Step 10: "Electric Test",
I am wondering does it actually test the "through-hole" continuity?

you only have one side routing....
Thus any test will report no problem

LQS1200 发表于 2018-1-27 15:41:22

我很好奇,怎么能漏掉?可以跳过工序?
图片网页上没显示那个时间

Jonian 发表于 2018-1-27 16:50:42

funnynypd 发表于 2018-1-27 13:00
>有意思,这也能过QC?
I have the same concern. Maybe because the manufacturing line got too many ord ...

具体原因外贸人员应已与LZ解释清楚并作处理。首先必须诚恳说声抱歉,这确实是我们的问题。
1、工程资料处理是正确的,所有层齐全,钻孔完好,但是在读入拼版程序的时候,钻孔竟然没读进去,
拼版程序我们软件已在20号有发布过检漏提示,遗憾的是这款板是在13号下生产的,所以检测功能没及时的用上,这是我们的原因没把好关;
2、如果资料上已经没孔了,测试是测不出来的,因为测试资料是依据工程资料为准的,这一点解惑为什么测试没测出来;
3、重点说明下哈,我们不存在说会因为价格便宜而跳过某道工序的,这是一定、绝对不允许发生的事,四款中仅绿油板出现此问题纯属巧合;
4、后续品质问题建议直接在ERP售后提交,我们有专门的投诉反馈渠道,为有效及时,方便快捷,ERP上都是有作各种链接一查便知,
而在此处我们找一个客户编号往往都要花半天时间,还望理解!

funnynypd 发表于 2018-1-27 23:07:26

本帖最后由 funnynypd 于 2018-1-27 23:08 编辑

>工程资料处理是正确的,所有层齐全,钻孔完好,但是在读入拼版程序的时候,钻孔竟然没读进去,
>拼版程序我们软件已在20号有发布过检漏提示,遗憾的是这款板是在13号下生产的,所以检测功能没及时的用上,这是我们的原因没把好关;

Thanks for the prompt reply on the forum and on my email.
The sole purpose for the feedback is: the root cause can be detected, and no more same issue happened again to any customer.

ibmx311 发表于 2018-1-28 17:33:33

这段洋文我要保存起来,今后给任何供应商放映问题的时候都要加上这样一句

funnynypd 发表于 2018-1-29 00:10:20

本帖最后由 funnynypd 于 2018-1-29 00:12 编辑

>jlc给我们带来方便,优惠,业务可能如你说,太多,品控跟不上了。
It is understandable that we all make mistakes.
When issue happened, it is a crisis, however, if it is treadted right, it can also turn out to be an oppotunity.
We will see.

>后续品质问题建议直接在ERP售后提交,
Do you have a link or guide how to get into this ERP system.
I don't know how to get into the ERP system from my account at JLC PCB web site.
By the way, thanks for your prompt response.

>而在此处我们找一个客户编号往往都要花半天时间
My customer number is part of the order number.
"Order Number: Y2-2204043A"
The "2204043A" is my customer number, the "Y2" seems to be different for each of my PCB order.

>不过人工QC应该也是能检查出疑问的,这个工位应该加强下
Somehow, we will need a double check process to make sure gerber file are processed correctly.
Otherwise, the same issue will happen again soon, espicially if we consider the number of orders are porcessed every day by JLC.

>今后给任何供应商放映问题
Do you have an oversea supplier?

LQS1200 发表于 2018-1-29 00:28:28

cocalli 发表于 2018-1-27 21:56
这个肯定是漏了,不会说省钱,省工序,没人会傻到这地步。
不过人工QC应该也是能检查出疑问的,这个工位 ...

这很难的吧,怎么可能要求每个都去看那么仔细,,JLC既然全自动的,程序不出漏洞,应该不会再发生了

funnynypd 发表于 2018-1-29 10:24:26

>讨论怎么改进服务,讨论怎么改进质量

"看到板子,一个都没有孔,不可疑?"
"全自动?就是因为全自动,才会人工忽略。"

It make sense.

>目前对邮件要求是100%当天处理,如果没有处理是要挨批罚抄写...
I think you guys did a good job on email reply. I will post the new ones when they arrived.
It can turn crisis to opportunities.

含笑半步颠 发表于 2018-1-29 12:20:21

faminkuang 发表于 2018-1-29 09:59
投诉邮箱
kevin#jlcpcb.com
客服邮箱


管的好宽- - 客户想在哪里说话,也要受约束,嗯嗯,章程抄的好,学以致用。

funnynypd 发表于 2018-2-6 05:51:54

I believe the PCB has been shipped. Is there a tracking number available?

grj0719 发表于 2018-2-6 09:35:12

难得论坛见到一个老外,围观{:lol:}

faminkuang 发表于 2018-2-6 09:42:00

本帖最后由 faminkuang 于 2018-2-6 09:43 编辑

funnynypd 发表于 2018-2-6 05:51
I believe the PCB has been shipped. Is there a tracking number available?

刚查询您的订单已经生产完成,pcb在发货部打包,今天能赶上晚上的航班,预计8号到达您那里。快递单号今天会给你发邮件告知。

cloudboy 发表于 2018-2-6 09:44:19

grj0719 发表于 2018-2-6 09:35
难得论坛见到一个老外,围观

难得见到一个全程我能看得懂英文的老外:)

funnynypd 发表于 2018-2-6 12:40:45

>刚查询您的订单已经生产完成,pcb在发货部打包,今天能赶上晚上的航班,预计8号到达您那里。快递单号今天会给你发邮件告知。
This is great. I am looking forward to hearing from you soon.

funnynypd 发表于 2018-3-7 08:29:13

本帖最后由 funnynypd 于 2018-3-7 08:36 编辑

PCB was received today (March-06-2018) finally.

The PCB are manufactured on Jan-28-2018. It took longer than expected to have the parcel shipped.
For some reason, the PCB wasn't shipped until March-2nd-2018 (DHL tracking number: 5869271251).

The other downside is the duty cost. Basically anything declare a value more than 20 CAD$ will need pay tax or duty.
The duty and process fee (charged by DHL) we paid probably are close to the cost of the item.
And I paid the same duty and process twice.
页: [1]
查看完整版本: JLC PCB Quality Issue: PCB drilling is missing.